Case Study · 20-1128.00 · 2020–2023

Oceania Tower II

An oceanfront tower, Hurricane Irma, and a competing engineering report on the other side — documented floor by floor, ground through roof.

Sunny Isles Beach, FL · Retained Engineer · High-Rise Condominium

ForensicHurricane
≈30-story oceanfront tower
Oceania Tower II

The Problem

A high-rise on the Atlantic took Hurricane Irma’s winds, and the claim record already contained an opposing engineering report with full floor-by-floor attachments. TCE’s evaluation had to meet that documentation standard level for level — tower, water suites, cabanas, and beach structures.

What TCE Did

  • Documented the tower floor by floor — ground through the 29th and roof — plus three ancillary structures
  • Built a Hurricane Irma event timeline exhibit and reconstructed the property’s permit history
  • Delivered the signed-and-sealed SDER with a full photographic appendix; the findings were later the subject of testimony
PerilHurricane Irma
PropertyOceanfront tower + suites & cabanas
DocumentationPer-floor, all structures
DeliverableSealed SDER + Appendix A
AftermathSubpoenaed testimony, 2023

← All projects  Discuss a similar project →